PE double wall corrugated pipe production line production introduction:
Model No. SJSZ-80/156
Screw diameter Φ80/¢156mm
Screw hardness HV740
barrel hardness HV940
Screw barrel nitridation depth 0.4-0.7mm
Screw rotate direction outward counter rotating
Barrel heating cast aluminum heater
Feeding mode automatic forced-conveying
Main Motor power: 55kw
reducer and distributor case
The reducer and distributor case were under gear grinding, nitridation treatment, with hard teeth surface.
Structure horizontal
Cooling mode external cycle cooling system
Import thrust bearing high torque output
Gear craft 20CrMnTi carburization hard surface process
The whole gear is a long-life, low noise and low heat reducing equipment.
Electric controlling system:
Temperature Controller RKC Temperature Controller
ABB inverter
Contactor France Schneider. contactor.
Mould
Material:stainess steel with high-quality
Forming machine
1\Forming rack is one set
2\The transmission system is the rack drive,
Cutterand stacker
Cutter control mode: PLC automatic control, air operated advancement
Stacker:Guidance
board and the floor use the stainless steel manufacture